Warehouse network
Eighteen warehouses across 17 provinces, from Lampung to Jayapura. Your inventory sits close to markets and work sites, with no dependence on shipments from Jakarta.
The network in numbers
- Active warehouses
- 18
- Provinces covered
- 17
- Total floor area
- 15,399 m²
- Average annual volume
- 190,000 m³
Coverage
Select a location to see its details
The large white dot is Central Warehouse Jakarta, the network's consolidation point. Orange dots are regional warehouses. Use the region filter to narrow the list.
Filter by region
-
Central warehouse
Jakarta Utara
DKI Jakarta
Komplek Pergudangan Satya Wirya, Jl. Raya Bekasi Km 20, Kp. Warung Jengkol RT 01 RW 13, Kel. Pegangsaan Dua, Kec. Kelapa Gading, Jakarta Utara
- Building area
- 7,440 m²
- Power supply
- 30,000 watt
-
Palembang
Sumatera Selatan
Pergudangan Sukarami D16 Blok D5, Jl. Lintas Alang-Alang Lebar, Palembang
- Building area
- 952 m²
- Power supply
- 2,200 VA
-
Bandar Lampung
Lampung
Jl. Laksamana Yos Sudarso No. 333, Garuntang, Bandar Lampung
- Building area
- 600 m²
- Power supply
- 4,200 watt
-
Surabaya
Jawa Timur
Komp. Pergudangan Bumi Maspion Selatan No. 12, Kel. Romokalisari, Kec. Benowo, Kota Surabaya
- Building area
- 1,300 m²
- Power supply
- 1,300 watt
-
Kubu Raya
Kalimantan Barat
Jl. Raya Kakap Pal IX, Kab. Kubu Raya, Kalimantan Barat
- Building area
- 800 m²
- Land area
- 1,000 m²
- Power supply
- 2,200 watt
-
Banjarmasin
Kalimantan Selatan
Komplek Pergudangan 88, Jl. Gubernur Soebarjo (Tol Lingkar Basirih Selatan), Banjarmasin
- Building area
- 600 m²
- Power supply
- 2,200 watt
-
Balikpapan
Kalimantan Timur
Jl. AMD Projakal No. 59, Karang Joang, Balikpapan Utara, Kota Balikpapan
- Building area
- 600 m²
- Power supply
- 2,200 watt
-
Denpasar
Bali
Jl. Pura Demak 234, Br. Batannyuh, Pemecutan, Denpasar
- Building area
- 500 m²
- Power supply
- 2,200 watt
-
Mataram
Nusa Tenggara Barat
Pergudangan Dasan Cermen No. 28 & 30, Jl. Raya Lembar, Kec. Sandubaya, Kota Mataram
- Building area
- 400 m²
- Power supply
- 1,300 watt
-
Ende
Nusa Tenggara Timur
Jl. Gatot Subroto, Mautapaga, Ende, Nusa Tenggara Timur
- Building area
- 116 m²
- Power supply
- 1,300 watt
-
Kupang
Nusa Tenggara Timur
Jl. Baitanu No. 7, RT 18 / RW 06, Kel. Alak, Kec. Alak, Kota Kupang
- Building area
- 540 m²
- Power supply
- 4,400 watt
-
Manado
Sulawesi Utara
Jl. Raya By Pass Manado–Bitung Km. 21, Airmadidi, Sulawesi Utara
- Building area
- 200 m²
- Power supply
- 2,400 watt
-
Palu
Sulawesi Tengah
Kel. Pantoloan, Kec. Tawaeli, Palu Utara, Sulawesi Tengah
- Building area
- 300 m²
- Power supply
- 1,800 watt
-
Kendari
Sulawesi Tenggara
Jl. Ahmad Yani Gang Makmur No. 26, Kel. Wua-Wua, Kendari, Sulawesi Tenggara
- Building area
- 480 m²
- Power supply
- 1,300 watt
-
Ternate
Maluku Utara
Jl. Kayu Merah, Ternate, Maluku Utara
- Building area
- 150 m²
- Land area
- 460 m²
- Power supply
- 1,300 watt
-
Ambon
Maluku
Jl. Raya Suli, Waitatiri, Desa Suli, Maluku Tengah
- Building area
- 200 m²
- Land area
- 1,000 m²
- Power supply
- 2,200 watt
-
Sorong
Papua Barat Daya
Jl. Malibella KM 11,5, Kel. Klawalu, Distrik Sorong Timur, Papua Barat Daya
- Building area
- 100 m²
- Power supply
- 1,300 watt
-
Jayapura
Papua
Jl. Kelapa 2 Entrop, belakang Bank Syariah Indonesia, Jayapura
- Building area
- 121 m²
- Power supply
- 1,300 watt
Storage area and fleet at Central Warehouse Jakarta.
Central hub
Central Warehouse Jakarta
The largest site in the network and its main consolidation point. Shipments from multiple suppliers are received and combined here before moving on to the 17 regional warehouses — one handover point, one stock record.
- Floor area
- 7,440 m²
- Network-wide floor area
- 15,399 m²
How clients use it
Ship once, store close, release in stages
The pattern most of our clients apply for running demand — from project materials to store inventory.
-
Step 01
Ship once, in bulk
Goods travel once to the regional warehouse nearest the work site, by road, sea, or air. A single journey replaces repeat deliveries from Jakarta.
-
Step 02
Store close to the point of need
Stock is recorded in the WIM system on receipt. Balances are visible across branches, so inventory positions can be checked without manual confirmation.
-
Step 03
Release as demand requires
Goods leave in stages as site work progresses or stores reorder, with stock already positioned near the point of need.
We review your volumes, destinations, and release frequency before recommending the most suitable warehouse.
See warehousing servicesRequire a quotation for a specific route?
Share your cargo details and routing — we will respond by the next working day.